Crews discovered a poor subgrade under the high school parking lot. To ensure a solid sub-base for the asphalt, extra measures of undercutting the subgrade and installing a geogrid to stabilize and strengthen the soil were taken.
Crews discovered a poor subgrade under the high school parking lot. To ensure a solid sub-base for the asphalt, extra measures of undercutting the subgrade and installing a geogrid to stabilize and strengthen the soil were taken.
In the STEAM Renovation as well as the middle school, temporary shoring was installed. This was necessary because portions of load bearing walls were removed. The shoring will relieve the weight of the load until the reinforcements are added.
The plumbing system for the middle school bathroom is already complete. The system was pre-fabricated off-site and brought to site complete and ready to install.
The STEAM Renovation is constantly making progress with many new developments happening in this area. Currently, the electricians are working on the in-wall rough-ins, the framers have almost all of the steel studs placed and have began hanging sheet rock, and the plumbers and HVAC workers are installing the overhead rough-ins.
The STEAM Renovation is constantly making progress with many new developments happening in this area. Currently, the electricians are working on the in-wall rough-ins, the framers have almost all of the steel studs placed and have began hanging sheet rock, and the plumbers and HVAC workers are installing the overhead rough-ins.
The STEAM Renovation is constantly making progress with many new developments happening in this area. Currently, the electricians are working on the in-wall rough-ins, the framers have almost all of the steel studs placed and have began hanging sheet rock, and the plumbers and HVAC workers are installing the overhead rough-ins.