In Photo #1, the skylights have been delivered and installed! The roof above the STEAM Addition is nearly complete. All that is left is wrapping the new membrane up and over the roof blocking on the West side.
In Pictures #2 and #3, the slab for the new natural gas generator has been poured! Inside the slab are two sheets of rebar which help strengthen the bond of the concrete and reinforce the slab.
In Pictures #2 and #3, the slab for the new natural gas generator has been poured! Inside the slab are two sheets of rebar which help strengthen the bond of the concrete and reinforce the slab.
As you can see in Picture #4, the masons have been working hard and making good time with the new walls on the addition. They have completed the Southwest exterior as well as the two main interior walls.