The old existing ring road has finally been removed! We had two asphalt pulverizers on-site working to pulverize the remaining old asphalt around the school. The machines convert it into a mixture of pulverized asphalt and base as shown in the picture.
The old playground equipment is out to make way for the new! Currently, the rough grading is being set and will be followed by the installation of underground utilities.
The old playground equipment is out to make way for the new! Currently, the rough grading is being set and will be followed by the installation of underground utilities.
The roof replacement will be ongoing throughout the summer. Here you can see the new roof that was recently installed over the MS/HS gym. Currently, the roof above the mezzanine is being replaced.
The MS gym is currently being prepared for the ceiling to get painted. This involves the removal of dust, dirt, loose paint, and other surface contaminants. The ceiling will then get spot primed where needed before the new paint is applied.
Summer school starts on Monday and heavy construction will continue throughout our campus. A safe, temporary path to the building was established for students that walk to school.
Summer school starts on Monday and heavy construction will continue throughout our campus. A safe, temporary path to the building was established for students that walk to school.